Skip to content
Balkan Tecnologia

Out of the monolith without stopping operations

The old system is replaced piece by piece, each piece running in production beside it, with observability and a way back.

A mint-green thread linking a large stone block to three smaller pieces.

Who it's for

Companies with an old system that still carries the business but breaks with every release and blocks any change.

How the package runs

  • A map of the current system and the parts that hurt most.
  • First cut: one part leaves the monolith and starts exchanging events with it.
  • Observability before the switch, to compare before and after.
  • Repeating it piece by piece, with operations running.

What you get

  • A piece-by-piece replacement plan, with order and risks
  • New parts in production beside the old system
  • Dashboards and alerts on both sides
  • A way back for every stage

FAQ

Do we need to rewrite everything?

Usually not. Replacing it piece by piece keeps operations running, and each stage goes into production as it is done.

What if the old system has no documentation?

That is common. The mapping starts from the code, the data and the people who use the system every day.

Page updated on